12th April, 2023

Ready to be dispatched... Bucket Elevator for Robson project installation phase at a glass manufacturing facility UK

Galvanised Steel Bucket Elevator boot c/w slatted tail Drum

Rated for 200TPH of mixed batch and glass cullet, the elevator will lift the product 40m into the batch plant mixer.

Part of a major furnace upgrade project to increase glass production from 120tph to 200tph

Find out more on our systems at www.robson.co.uk

#bucketelevator #glass #glasscullet #bulkhandling #systems #projects #since1906